Construction is well under way for the refurbishment of the grade 5/6 area and the multi-purpose room used by the Osh Club (now located in The Hall).
Construction is well under way for the refurbishment of the grade 5/6 area and the multi-purpose room used by the Osh Club (now located in The Hall).